Rigging failure during riser recovery – soft slings parted

During recovery of a 10m riser section with buoyancy modules attached, the riser section dropped 2.5m to deck when the soft slings parted after rubbing on the sharp edge of the Deadman Anchor (DMA). During decommissioning activities, the riser was cut into approximately 10m long sections.

The section had been weighted down with a DMA prior to cutting. On completion, the DMA was recovered along with the riser section suspended below the DMA.  When slewing the riser section inboard, the riser section (3.8Te) fell approximately 2.5m to deck when the slings parted after rubbing on the sharp edge of the DMA.

Control measures were being followed with all personnel standing clear of the lifting area, behind the barriers as stipulated by the risk assessment.

What went wrong – findings

  • A pendulum effect occurred whilst the product was draining before recovery onboard, which resulted in the riser section suspended below the DMA moving against the sharp edges on the DMA, and thus cutting the soft slings;
  • The sharp edges of the DMA had not been identified as a potential hazard in relation to the use of soft slings.

Lessons learned/actions

  • Wire rope slings should be used where slings connect with a DMA;
    • The exception would be, unless the use of soft slings has been fully risk assessed with specific consideration given to the possible contact with the edges of the DMA;
  • Consider the use of rounded DMAs where there is a potential for sharp edges to connect with the rigging;
  • Consider having pad eyes welded along the bottom profile of the DMA to mitigate against fouling with the rigging.

Members may wish to refer to:

Safety Event

Published: 11 February 2021
Download: IMCA SF 05/21

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.