Unexpected movement of conductor during diver dredging operations

What happened

Divers were conducting dredging operations in preparation for an external cut of a conductor (E5 in the diagram below) using a diamond wire saw.  Due to seabed conditions, this was one of a number of dives dedicated to making conditions suitable for the conductor cutting.  As the divers continued dredging, the conductor moved unexpectedly and came to rest against an adjacent conductor (E2 in the diagram below).

Diver 2’s umbilical was found to be in free span between the two conductors.  As a precaution, the decision was made to secure the conductor to the vessel crane and manoeuvre the vessel to allow the umbilical to be released. This was conducted successfully, and the divers recovered to bell with no injury nor damage to umbilical.

What were the causes?

Our member noted the following:

  • Immediate Cause – Conductor toppled at a severance point due to displacement of surrounding seabed and grout during dredging operations;
  • Underlying Causes – assumption that the conductor was stable, due to: 
    • Information relating to the task (an incomplete sub-surface cut) had not been highlighted during client work pack compilation
    • Unclear datum measurement with respect to the as-found mudline and potential scouring.
  • Root Cause – the vessel team did not have all the relevant information they needed, to complete a suitable Management of Change to move from internal to external cutting of the conductor.

Actions

  • Change to methodology for diver work around conductors, so that they are restrained with rigging prior to any dredging operations;
  • Ensure suitable verification of data by client during onshore project preparation phase;
  • Refine and update existing engineering best practice and risk assessment for cutting operations;
  • Ensure management of change procedure provides suitable guidance on process for evaluating and approving change request in line with agreed risk level.

Members may wish to refer to:

Safety Event

Published: 28 October 2021
Download: IMCA SF 29/21

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.