MSF: LTI – Fall from Height  (control of work during SIMOPS)

The Marine Safety Forum published Safety Alert 21-18 relating to an incident where someone fell from the bridge deck to the deck below.

What happened

Four crew in two teams were working on maintenance of the vessel superstructure. One of the teams was on the monkey island; the other, on the bridge level gantry, removing gratings and working on the steel frame of the gantry.  When the team finished on the monkey island, they went down to the bridge level, and one of them removed his safety harness. He spotted an old paint drip that needed dealing with, and considered that a check around the bridge to finish off the job before break was a good use of time. During this task he found it necessary, owing to  restricted space, to work moving backwards, not looking behind to see if there were any obstacles.  He was aware of the other team working on the same level and that they had been working on gratings, but he did not check to confirm where exactly they were at this moment.  Whilst working he took a step backwards and fell 3m through the opening left by the lifted section of grating down to the boat deck.  The MSF’s member does not report what happened then but the incident was considered an LTI.

What went wrong/what was the cause?

  • Control of Work and Permit to Work Systems weren’t correctly and effectively implemented on board;
  • There was a lack of situational awareness and risk perception, a lack of awareness of SIMOPS, and inadequate communications between deck personnel in charge and deck crew;
  • There were no barriers or signage in the area of the incident. A fall hazard was introduced by removing the bridge gantry gratings.

Actions

  • More effective and thorough toolbox talks and pre-task risk assessment, particularly for non-routine tasks;
  • More thorough approach to SIMOPS:
    • During scope of work planning, identify any combined operations and any additional hazards introduced by the SIMOPS. Can SIMOPS be avoided, and tasks executed at different times?
    • Assess the relevant level of risk associated with the SIMOPS.
    • Are the planned control measures enough to keep things safe? If not, identify additional risk reduction measures and update the relevant risk assessments.
    • Whatever happens, make sure a record is kept so the same mistake doesn’t happen again – provide input to the Permit to Work / Control of Work process and “embed” any changes identified.

 Members may wish to refer to:

Members may also wish to refer to the following incidents involving the word “grating” where someone has fallen through grating or otherwise grating has played a role in an incident: legacy.imca-int.com/safety-events/?searchitem=grating


IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.