Focus on third-party dropped objects
What happened
A member reports a significant increase in the number of dropped objects at third-party premises.
The dropped object incidents have included many high potential near miss dropped objects which under different circumstances could have resulted in debilitating personal injuries. The dropped objects have been all manner of items, from heavy pipes, rigging failures through to nuts and bolts, that all had the potential for personal injury.
Examples include:
- Rigging failures;
- Weld Failures;
- Overhead gantry crane failures;
- Dropped pipe during pipe handling;
- Snagged rigging during pipe transfer;
- Incorrectly secured rigging.
What were the causes?
The following findings were identified from the third-party dropped object incidents, which were made a focus of learning, avoidance, and mitigation strategies to prevent future dropped objects:
- Inadequate procedural control that did not identify the correct process and risk management to be followed during pipe handling;
- Inadequate acknowledgement, adherence, understanding and assessment of risk controls in the risk assessments – truck inspections, banksmen/additional spotters not positioned correctly, toolbox talks not identifying the hazardous activities;
- Certifications of lifting equipment not adequate for expected use case;
- Incorrect equipment being used for transferring pipe;
- Human factors, risk perception and competency of personnel involved in operations;
- Inadequate quality control and inspection;
- Inadequate planned maintenance systems in place.
Our member reminded crew what to do:
- During the contracting process ensure that third-party HSE Management Systems (HSEMS) have fit for purpose risk controls in place to prevent/mitigate dropped objects;
- Set clear expectations with third-party contractors in respect of lifting and pipe handling activities.
- Formal understanding of differences between company and third-party contractors’ levels of oversight, mode of control and accountabilities – BEFORE starting work;
- Audits, inspections, and verifications of third-party operations to ensure that proper risk management controls are in place to prevent dropped objects;
- Ensure third parties consider and align with industry good practice;
- Remember the “7T’s” – Take The Time To Think Things Through;
- Support third-party contractors to ensure a focus on risk perception and considering regular “fresh eyes” reviews of work tasks and equipment use;
- On all worksites ensure that the obligation and expectation to exercise the stop work authority is clearly communicated and understood by all parties.
Members may wish to refer to:
Safety Event
Published: 1 November 2022
Download: IMCA SF 24/22
IMCA Safety Flashes
Submit a Report
IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.
IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.
IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.