Near miss: load lifted without notice putting crew in the line of fire
What happened
During cargo operation at an offshore installation, the deck foreman on the installation noticed that a sling was twisted while starting to heave up a cargo. An AB on deck was asked to remove the twist, when the crane operator started lifting the load without proper notice, which placed the AB between the cargo and a 20’ container. This could have resulted in a fatality or severe injury. The operation was stopped immediately; there were no injuries.
What went wrong
- The crane operator had poor visibility on deck;
- Poor communication:
- The deck foreman on the offshore installation rejected the officer of the watch’s request to disconnect the crane before sending the AB;
- Nothing was done to secure the safety of the AB in charge of untwisting the sling;
- The crane operator started to lift with no instructions nor signal.
Lessons learned
- When the situation deteriorates, STOP. Become extra vigilant, remain aware of what is going on around you, ensure good communication between all stakeholders;
- Ensure clear deck policies and stop work policies are followed;
- Don’t take short cuts, don’t hurry, don’t assume that everything is OK.
Members may wish to refer to
Safety Event
Published: 21 December 2022
Download: IMCA SF 29/22
IMCA Safety Flashes
Submit a Report
IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.
IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.
IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.