MAIB: A heavy sheave fell over causing an LTI

What happened

A bosun suffered a broken leg when a heavy sheave he was trying to manoeuvre, fell against him. On a vessel going into port, crew were preparing to offload equipment. Very early in the morning, the bosun decided to prepare a 0.5t sheave, which was due to be lifted ashore. He removed the lashings that were securing the sheave vertically against some pipework and started to roll it toward the port side hatch in readiness for offload. The bosun was manoeuvring the sheave past some oil drums when he lost control and the sheave toppled over, struck his thigh and then trapped him under its weight. With difficulty he managed to raise the alarm using his handheld radio. The crew mustered quickly, lifted the sheave off his leg and administered first aid. Once in port the bosun was taken to hospital with multiple fractures to his leg and was unable to return to work for several months.

What went wrong

  • The bosun worked alone;
  • The sheave, half a ton and over 1m in diameter was not stowed in an authorised location;
  • The crew had no lifting plan in place to move it across the space. The sheave was unwieldy and careful planning and thought would have been required before it could be moved safely, despite it being easy to roll;
  • The bosun was unaware of the weight of the sheave and had underestimated the risks and hazards involved in both its removal and relocation.

Lessons

  • Don’t just “crack on” with a task rather than bother other people to get help – STOP and THINK;
  • Have a clear, communicated and fully understood plan for moving an object of this size and weight.

Members may wish to refer to

Safety Event

Published: 12 June 2023
Download: IMCA SF 14/23

Relevant life-saving rules:
IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.