Near miss: dislodged grating with potential fall to sea
What happened?
A section of Glass Reinforced Plastic (GRP) grating on a vessel dislodged and dropped to sea. The incident occurred when a welder was on the grating passing a welding hose connection to a level further up, during preparations for work activities. The welder arrested their fall on a support beam and recovered without assistance to a safe position. The failed grating section fell 5.5m to sea and was lost. The welder, who did not suffer any injuries, reported the near miss. Operations nearby were suspended to allow follow up investigation and for the worksite team to complete a full review and “Time Out for Safety”.
What went wrong?
- The securing clips provided, which should have held the gratings in place, were not spaced correctly nor fixed securely to the framework;
- Two of the securing clips were missed from the original installation design;
- No-one spotted that the grating section was installed with an overhang on one end. As the welder stepped on this area, the forces allowed for the grating to tip and fall to the sea.
What went right?
- The individual managed to catch himself and recovered to safety;
- The incident was reported, and the investigation conducted quickly, corrective actions taken immediately.
What can we learn
The grating fastenings or fixings were not identified or included within the vessel planned maintenance system. There was no routine inspection or visual check of the dimensional fit or condition of the securing clips. Consequently, over the installation period the grating became insecure, without the change being detected.
Actions taken
Our member took the following actions:
- Changes to planned maintenance system for grating and fixings, and amendment of safety checklists for area;
- Added grating to future DROPS surveys, particularly on areas where work on split levels occurs, where the risk of serious personal injury may occur from falls and where potential for significant dropped objects exists;
- Future grating design should follow good practice guidance for load capacity, fastenings and the avoidance of overhangs that may create a cantilever effect;
- Changes to grating should be pre-approved by vessel Captain or Chief Engineer, temporary or permanent modifications should not be performed without approvals.
Members may wish to refer to:
Safety Event
Published: 30 April 2024
Download: IMCA SF 09/24
IMCA Safety Flashes
Submit a Report
IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.
IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.
IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.