Lifting operations – securing equipment
The Marine Safety Forum has published Safety Flash 11-02 regarding an incident in which, owing to a failure of communication, attempts were made to lift equipment which was still secured to the deck. Although no harm was done, the incident could have resulted in serious injury to personnel and damage to the equipment being lifted.
Members are reminded of Guidelines for lifting operations and Guidance on operational communications.
Safety Event
Published: 27 January 2011
Download: IMCA SF 01/11
IMCA Safety Flashes
Submit a Report
IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.
IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.
IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.