Skip to content

Lost time injury (LTI): Thumb injury

A member has reported an incident in which a member of the crew sustained a lost time injury (LTI) to his thumb. The incident occurred when a vessel’s marine engineering team was conducting a water leak repair on part of one of the main engines during a vessel transit. The repair involved the removal of the piston and connecting rod arrangement, as well as the removal of the cylinder liner, to allow for cleaning and re-sealing. Whilst removing the piston and connecting rod, the injured person had his hands inside the engine crank case to stabilise the bottom of the connecting rod and prevent it causing damage as it passed the bottom of the cylinder liner.

The removal of the piston was accomplished using a 1Te chain block attached to the piston crown. At this stage of the operation, the injured person was on the starboard side of the engine and all the other team members were on the port side with various other duties. Communication was by means of hand signals: owing to the high noise levels in the engine room, clear verbal communication was not possible.

As another crew member started hauling up on the chain block, lifting the piston and connecting rod, the injured person found his left thumb trapped between the bottom of the cylinder liner and the bottom of the connecting rod. He motioned with his free hand to lower the load which allowed his injured thumb to be released. He then reported to the medic where, following a medical examination, he was subsequently medevaced ashore.

Although this task was not viewed as ‘routine’ maintenance, it had taken place many times before. The team consisted of four experienced members including the 2nd engineer, a rating and two fitters. The injured person was the supervisor for the shift during the maintenance task. A permit to work (PTW) and risk assessment had been completed for this task and all crew members involved had been present for the toolbox talk before it was started.

Position of the injured person at the time of the incident (re-enactment)
Position of the injured person at the time of the incident (re-enactment)

Following investigation, the company identified the following causes:

  • Lack of organisation
    • This meant that the injured person was the supervisor but also ended up taking a hands-on role in the operation. As the injured party was the team leader, and also taking a key part in the operation, this reduced the level of co-ordination of the task and its associated hazards;
  • Lack of hazard awareness and risk perception
    • Though existing controls and safety management systems were followed, they failed to identify and allow clear communication of the potential hazards involved in this operation
    • The risk assessment did not readily recognise the potential for pinch points or dropped loads during this task;
  • Poor communication in noisy engine room environment
  • Control and co-ordination of the task was reduced due to the difficulty in clear communication
  • This lack of control and co-ordination during the operation allowed the load to be moved while the injured person had his hands on the connecting rod
  • The crew member controlling the load by means of the chain block had no clear line of sight to the injured person whose hands were inside the engine;
  • Incorrect positioning of hands
  • The injured person’s thumb was in the pinch point during movement of the load.

The following actions were taken:

  • Review relevant task related risk assessments to ensure all associated and potential hazards are clearly identified and recorded;
  • Ensure all lifting equipment is correctly rated and inspected for the intended task prior to use;
  • Communicate the importance of toolbox talks and safe working practices to ensure key hazards are identified, discussed and addressed.

Safety Event

Published: 25 November 2011
Download: IMCA SF 13/11

IMCA Safety Flashes
Submit a Report

IMCA Safety Flashes summarise key safety matters and incidents, allowing lessons to be more easily learnt for the benefit of all. The effectiveness of the IMCA Safety Flash system depends on Members sharing information and so avoiding repeat incidents. Please consider adding safetyreports@imca-int.com to your internal distribution list for safety alerts or manually submitting information on incidents you consider may be relevant. All information is anonymised or sanitised, as appropriate.

IMCA’s store terms and conditions (https://www.imca-int.com/legal-notices/terms/) apply to all downloads from IMCA’s website, including this document.

IMCA makes every effort to ensure the accuracy and reliability of the data contained in the documents it publishes, but IMCA shall not be liable for any guidance and/or recommendation and/or statement herein contained. The information contained in this document does not fulfil or replace any individual’s or Member's legal, regulatory or other duties or obligations in respect of their operations. Individuals and Members remain solely responsible for the safe, lawful and proper conduct of their operations.