DESIGN for the hyperbaric reception facility (HRF) forming part of a hyperbaric evacuation system (HES)
Rev. 0.1 – October 2018 – Detail sheet, section 3, item 1.1 to 1.3 updated to harmonise industry guidance and practice.
IMCA has launched a new website - please visit www.imca-int.com to explore our technical library and access downloads.
Related Information Notes
- Summary of 2021 DESIGN Changes for Hyperbaric Rescue Unit (HRU) Life Support Packages (LSP)
- Summary of IMCA D 018 Document Changes 2021
- One Year Adoption Period for Updated IMCA DESIGN Suite Documents
- Hyperbaric evacuation - Introductory videos
- Competence of auditors
- The evaluation and testing of the environmental control of hyperbaric evacuation systems