Comments from the report: This is a positive report which highlights how familiarity of Key DP Personnel with the vessels Critical DP systems can lead to a successful outcome following […]
A new IMCA website has launched - www.imca-int.com
This site is available temporarily for access to the following:
˙ Event Registration - new system coming soon
˙ Membership Application - new system coming soon
˙ Store - items being finalised for existing orders
DP station keeping event bulletins enhance the traditional reporting and analysis of dynamic positioning station keeping events and incidents. They ensure that the industry is provided with prompt feedback, including anonymous factual case studies of events reported to IMCA.
Individual DP events are available individually online, tagged and searchable, while the traditional PDF collections are also available for download.
To be included into the subscription list for the DP Event Bulletin emails, email communications@legacy.imca-int.com
All members are encouraged to contribute relevant DP information by using our reporting template which is available under Submit a Report where you will also see details on how to submit your information.
Richard Purser
Technical Adviser - Marine
Contact
Comments from the report: This is a positive report which highlights how familiarity of Key DP Personnel with the vessels Critical DP systems can lead to a successful outcome following […]
Considerations of the IMCA Marine DP Committee from the above event: This was a simple case of Key DP personnel not being included in the ASOG process, the ASOG should […]
Case narrative A new senior DPO had been appointed to a DP equipment class 2 vessel via a crewing agent. It was found after joining that his experience and certification […]
Comments from the report: The error was traced to a serial interface module for DP Controller A and confirmed that the red error lamp on this module was illuminated. Whilst […]
Comments from the report: A wrongly installed extra capacitor at the bow thruster frequency drive caused overheating of this equipment. The extra capacitor was installed by the electrical designer and […]
Comments: Investigation started at the breaker for DG No. 5 in the port switchgear room. The breaker showed tripped and there was a fault present on the auto voltage regulator (AVR). DG No. 5 […]
Comments It was a single rip tide and when it had passed the vessel was set up back in automatic position mode. There was clear evidence that a degraded performance […]
Comments After all the checking, it was found that there was water ingress at the L-Band connector to the antenna on the mast. This was dried and cleaned. The connectors […]
Comments: A failure of a plug (old decommissioned cooling line for fridge compressors) on seawater cooling pipe for the Ac compressors resulted in flooding in the incinerator room (the water […]
Comments: The report concluded that the DPO was conducting too many concurrent tasks so that he did not sufficiently monitor the vessel speed during the time the vessel was being […]