DP station keeping event bulletins enhance the traditional reporting and analysis of dynamic positioning station keeping events and incidents. They ensure that the industry is provided with prompt feedback, including anonymous factual case studies of events reported to IMCA.

Individual DP events are available individually online, tagged and searchable, while the traditional PDF collections are also available for download.

To be included into the subscription list for the DP Event Bulletin emails, email communications@legacy.imca-int.com

Submit a Report

All members are encouraged to contribute relevant DP information by using our reporting template which is available under Submit a Report where you will also see details on how to submit your information.

IMCA Contact

Richard Purser
Technical Adviser - Marine
Contact

Select some filters

Lack of operational planning leads to DP incident

Comments from the report: It was concluded that the loss of both DGNSS were due to huge superstructure of the installation interfering with satellite signals.  This phenomenon is called reflection […]

| Included in IMCA DP Event Bulletin 03/20

DP incident caused by human factor

Comments from the report: It is mentioned in the report that DG#4 tripped out for unknown reasons.  Elsewhere in the report the cause of this incident is mentioned as complacency […]

| Included in IMCA DP Event Bulletin 03/20

DP2 semi-submersible MODU DP incident

Case narrative: A DP2 Semi-submersible mobile offshore drilling unit (MODU) was working in field preparing for drilling operations on location. The environmental conditions at the time were benign. Cargo operations […]

| Included in IMCA DP Event Bulletin 02/20

DP incident with assisted mooring

Comments from the report: During cargo operations in DP assisted mooring, due to undefined information being fed to the DP system, the pitch on the port propeller increased to maximum. […]

| Included in IMCA DP Event Bulletin 02/20

DP incident caused by software glitch

Comments from the report: The two meters move command was given in two one-meter steps to the DP system by the operator with a time lapse of a few seconds. […]

| Included in IMCA DP Event Bulletin 02/20


Change of heading leads to DP incident

Comments from the report: The vessel had been on DP for the whole day and in order to lift the ROV on deck with the crane, vessel heading had to […]

| Included in IMCA DP Event Bulletin 01/20


Pipe leak leads to loss of all thrusters – DP incident

Comments from the report Whilst pressurising the fire main for helicopter operations, a gasket failure occurred on the pipework valve under the engine room floor in front of transformers 690V/440V […]

| Included in IMCA DP Event Bulletin 04/19





Planned investigation resulted in DP incident

Comments from the report: An AVR problem in diesel generator No. 1 engine caused an over voltage in the system.  Due to increased voltage, the standby machine could not be […]

| Included in IMCA DP Event Bulletin 01/19





Unintentional selection of manual mode – DP incident

Comments from the report: Initiating event: Inadvertent selection of manual mode whilst in full DP mode Main cause: Human factor – The vessel mode of operation was changed from automatic […]

| Included in IMCA DP Event Bulletin 01/18