Skip to content

IMCA produces a range of materials for its members as information notes, covering safety, technical, regulatory, commercial and various other issues relevant to its members.

Members can access all of these materials by logging in to this site. Non-members can view titles, for information, and a small number of individual articles deemed of wider public interest.

Browse our most recent information notes below, or use the filters to view our archives by subject and/or year.

Select some filters

Considerations for walk to work and multi operation vessels – regulatory guidance

The UK HSE have recently published guidance on walk to work systems, please see attached link http://www.hse.gov.uk/osdr/assets/docs/is1-2019.pdf . Although written for the oil and gas sector much of the content could also be used beneficially in the offshore wind industry. If you have any queries please contact Andy Goldsmith andy.goldsmith@legacy.imca-int.com.

This content is only available to members.

| Information Note number 1449 | Original reference(s) IMCA M 03/19

Toolbox talk prompts – CTV transfer with DP vessel

This information note was produced under the supervision of the IMCA Marine Renewable Energy Committee. Prior to a personnel transfer to or from a DP vessel, check and confirm that:Combined responsibility:Weather windows are suitable and communicated to allow transfer;Site and task risk assessments are available to cover specific risks in transferring

This content is only available to members.

| Information Note number 1447 | Original reference(s) IMCA M 01/19

Toolbox talk prompts – CTV deckhand – personnel transfer

This information note was produced under the supervision of the IMCA Marine Renewable Energy Committee.  Download the PDF for the full illustrated prompts. Originally issued with the following reference(s): IMCA M 03/18

| Information Note number 1413 | Original reference(s) IMCA M 03/18

IMCA marine renewable energy walk to work (W2W) decision support tool

The IMCA Marine Renewable Energy Walk to Work (W2W) Decision Support Tool is intended as a guide for supporting those companies who have determined a need for a W2W solution to help identify key considerations when developing their W2W configuration. Originally issued with the following reference(s): IMCA M 01/18

This content is only available to members.

| Information Note number 1398 | Original reference(s) IMCA M 01/18

4 post(s)